Skip to content

Dedicated Teams

Testing that decides whether a release goes out

A QA lead and automation engineers take over regression tests, load tests and the checks every release must pass. They work in your repository and report in your ticket board.

What the pod takes over

  • Regression automation

    the flows that must keep working after every change.

  • Performance and load tests

    run against the peaks your business sees.

  • Release gates

    a release waits until its checks pass.

  • Test data

    masked, so real customer records stay out of test environments.

  • Accessibility checks

    web screens tested against WCAG 2.2 AA.

The first fortnight

We agree with you the ten flows that cost the most when they break: a checkout, a payment, a dispatch, a login. You tell us which ones hurt; we write them down with the expected result for each.

What happens to one change

  1. 01A developer merges a change.
  2. 02Your pipeline runs the suite and the build passes or stops.
  3. 03On a failure the pod decides whether it is a real defect or a fragile test.
  4. 04A real defect goes on your board with steps to reproduce. A fragile test gets fixed.
  5. 05Load tests and accessibility checks act as release gates too.

The monthly report

  • Coverage

    how much of the product the automated tests exercise.

  • Flaky-test rate

    how many tests fail without a real defect.

  • Time to detect

    how long a defect lives before the pod finds it.

Test tools

Playwright and Cypress drive the browser. Jest and PyTest test the code. k6 and JMeter generate load, GitHub Actions runs everything on each change and Allure builds the reports.

What we need from you

Access to a non-production environment and a reviewer on your side who knows how the product should behave.

Terms and ending

The minimum is three months, billed monthly, with 30 days' notice. A QA lead runs the pod and you approve each engineer. The suites live in your repository and run in your pipeline, so they stay with you when the pod leaves.

Questions buyers ask

Yes. The pod starts from the ten critical flows.

Yes. Load tests run against the peaks your business sees and gate the release alongside the regression suite.

It pairs with a dedicated development pod or with DevOps and reliability work on your pipeline.

Which ten flows cost you most when they fail?

Tell us what you want to build.

The first call is 45 minutes with an architect, usually the founder. It is free, and we will sign an NDA first if you ask.